Al Khan Al Ahmar Primary School
Al Khan Al Ahmar Bedouin Camp, Palestinian Territories
follow
share on:mail linkcopy link to clipboardShare via LinkedInShare via TwitterShare via FacebookShare via Facebook
Earthship technique on the Palestinan desert.

image: ARCò | CC-BY_black.png some rights reserved
i
Category:
education
Phase:
in use
Design:
ARCò - Architecture & Cooperation
Updated:
13 February 2014
introduction

This emergency construction project was included in a wider international cooperation project, in which a Bedouin community decided to build a school for their children in their current camp. The starting constraints were quite complex: absolute prohibition of using cement and foundations, due to the prohibition for the Palestinians of non-temporary artifacts in the area C of the West Bank, velocity and simplicity in the construction; minimum costs and local non-skilled manpower. From these constraints came up a project that brings together the rapid and simple construction with a high-level of comfort conditions. The walls, made of tires fulfilled with earth, and the roof, made with sandwich panels supported by wooden beams were built in just two weeks with a first reduced budget. Thanks to several later donations, the school was completed with all the closing elements including a photovoltaic system for the production of electricity. All the works were carried out by manpower from the local community, under the technical direction of ARCò.

The school under construction

image: ARCò | CC-BY_black.png some rights reserved
i
cultural and social context

The Jahalin Bedouin tribe was developing a traditional semi-nomadic way of life in the desert land of what nowadays is the South of Israel until 1948 when the war expelled them to the North towards the surroundings of Jerusalem, in an area that today belongs to the West Bank but is still under Israeli administrative and military control. Until today, the Jahalin are still recognized by UN as refugees, and are organized in four camps within about 300 families, sited in the desert area around East Jerusalem. Al Khan Al Ahmar community is composed by around 60 families, who live from the few livestock they still own and from the international aid.

Al Khan Al Ahmar Bedouin Camp

image: ARCò | CC-BY_black.png some rights reserved
i
materials and building techniques

The walls were built using the earthship technique, recycling old tires, and fulfilling them with earth. The exterior and interior plastering was also made out of earth, mixed with white cement (in different proportions) on the final layer.

The roof consists on sandwich panels over a wooden beam structure.

Pavements are made out of wood installed directly over the ground.

The Constructive System

image: ARCò | CC-BY_black.png some rights reserved
i
read more >
< read less
earth and climate

The walls were built using the earthship technique, recycling old tires, and fulfilling them with earth. The exterior and interior plastering was also made out of earth, mixed with white cement (in different proportions) on the final layer.

The structure just after the first layer of the external plastering

image: ARCò | CC-BY_black.png some rights reserved
i
read more >
< read less
image gallery
Construction

image: ARCò | CC-BY_black.png some rights reserved
i
Construction

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
Construction

image: ARCò | CC-BY_black.png some rights reserved
i
Construction

image: ARCò | CC-BY_black.png some rights reserved
i
The toilets pavilion

image: ARCò | CC-BY_black.png some rights reserved
i
Construction

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
First phase finished

image: ARCò | CC-BY_black.png some rights reserved
i
technical drawings
Plan

image: ARCò | CC-BY_black.png some rights reserved
i
Section

image: ARCò | CC-BY_black.png some rights reserved
i
Constructive Section

image: ARCò | CC-BY_black.png some rights reserved
i
Instructions Booklet

image: ARCò | CC-BY_black.png some rights reserved
i
Model

image: ARCò | CC-BY_black.png some rights reserved
i
Location
show earth plate boundarieshide earth plate boundaries
Explore more inspirations
Keyword:
desert (8)
participation (77)
earth (58)
low tech (24)
recycled recources (43)
prev
  •  urban planning
    Old walled city of Shibam
    Shibam
  •  urban planning
    arcosanti
    Arizona, U.S.A.
  •  education
    New Classrooms at Al Khan Al Ahmar Primary School
    Al Khan Al Ahmar Bedouin Camp, Palestinian Territories
  •  health & sanitation
    RE-MOVABLE CLINIC
    Palestinian Territories
  •  education
    Primary school in Ramadin Al Janub
    Ramadin Al Janub, Palestinian Territories
  •  urban planning
    Arg-é Bam
    Bam, Iran
  •  education
    Ecole du Scarabée / Scarab School
    north of timbuktu, Mali
  •  education
    Wadi Abu Hindi Playground
    Wadi Abu Hindi Bedouin camp, Palestinian Territories
next